Quality control is split into three gates, and each gate has a recorded check and a defined reaction when it fails. A gate without a reaction is a form, not a control.

The three gates

Incoming inspection covers the components where a bad lot cannot be caught later: battery cells, motors, adapters and the PCBA. In-process inspection covers the build steps where a fault is created and would be hidden by the next operation. Final inspection runs on the finished unit after ageing, against the same functional limits used on the line.

Reliability, per model

Reliability testing follows the model and the market: a 1.2 m drop test (report ZKT-2406036126S), a stacking test (ZKT-2405235718S), particle size analysis for infusion devices (CTL24071909-1), and life-cycle testing where a mechanism moves. Where certification requires a third-party laboratory, the report is issued by that laboratory and the number is published on the certification page rather than summarised in marketing language.

What happens when a lot fails

A failed lot is quarantined, the component lot is traced back through incoming records, and the decision — rework, return or scrap — is written down with the reason. The next shipment of that model carries the change, and the buyer is told what changed.

At a glance

System
ISO 9001:2015, certificate 609-24-QZ-02758-RO-S, valid to 7 March 2027
QC team
10 QC specialists across IQC, in-process and final inspection
Gates
Three recorded checkpoints — incoming material, in-process and final — each with a defined reaction
Reliability tests
1.2 m drop, stacking, particle size analysis and life-cycle, depending on the model
Reports
Report numbers published on the certification page, not summarised
Deliverables

What you get

01 An inspection plan that names what is checked at each gate and who signs it
02 Incoming inspection records for critical components — battery, motor, PCBA, adapter
03 Reliability test reports for the model, including the failures found and the change made
04 Third-party reports where certification requires them (CE-EMC, FCC, RoHS)
05 Batch traceability, so a defect can be narrowed to a component lot